Best Practices for Using Temporary Casing During Drilling Operations

A construction site with a pile driver and crane driving a steel pile into the ground under a clear blue sky.

Temporary casing is a critical tool in drilled shaft construction, ensuring borehole stability, preventing soil collapse, management of overconsumption of concrete, and managing groundwater intrusion.  Whether working in loose soils, water-bearing formations, or challenging rock conditions, selecting and installing the right casing can make the difference between a smooth operation and costly delays. In this […]

We’re Doing Things Different In 2026!

Join us in California for our annual Hollow Bar Seminar. This year’s event features a new format and a unique opportunity to connect with industry professionals in a more focused setting.
To celebrate this limited-capacity event, registration is being offered at a highly discounted rate. Space is limited, so be sure to reserve your spot early.

This field is for validation purposes and should be left unchanged.
Address(Required)
Payment note: Credit card payment links are available upon request. A 3% processing fee applies.

OR

Download the registration form and email it to destinya@westernequipmentsolutions.com by October 8th.